MastGhar.com
. .. .
. Request a Call Back! .
Please fill in all your details and we will call you back.
Name
Phone
Email
Message / Enquiry
. . .
. .. .
. Contact via Phone .
Mobile +91 9910371636
+91 9810359154
Phone 011 25190311
011 25190365
 
. . .
 
Property Description
Features
Standard Specifications
Delux Specifications
Price List and Payment Plans
 
 
 
 
BPTP Park Serene ID: mast11322  
 
BPTP Park Serene Gurgaon
 
   
 
The Location
 
 
 
Floor Plan And Site Plan
 
 
 
Features
 

Location:  Sector 37D, Gurgaon
Plot Area: 24 acres(approx)
Block : 14
No. of Units: 950+
Architect: Sikka Associates

 
 
BPTP launched another grand state of the art Group Housing Project “ Park Serene”. The project is located at Sector 37-D, Gurgaon.
 Located in the serene, calm and nascent environs alongside the Dwarka super expressway is the grand project “The Park Serene”. Spread in an area of 21 acres, with 80% open area, the only limitation to the concept of “blessed living” is one’s own imagination. The remarkably outstanding developments which are planned in the area make the Group Housing one of the most promising destination for the end users in the years to come. The brand BPTP lends more credence and value to it and reassures the unmatched quality construction as delivered in the past by the company .The condominiums are a confluence of luxury, class and convenience and has excellent futuristic projections in terms of returns expected on investments for numerous reasons. Some of the most redeeming features of this new venture are as under-mentioned –
The 150 mt. wide expressway will pass within half a km. range of the project.
The construction of the said expressway has already been inaugurated (source HT).
The metro runs parallel to this expressway and therefore this project has exceptional connectivity.
There is a 400 acres reserved green right opposite the project.
The 3000 acres plus SEZ earmarked in the master plan is in the close proximity of the project.
There are at least five International schools coming up in the vicinity.
There is also a 100 bedded hospital at 500 mts from the project and its construction is already underway.
The underpass  from the Hero Honda Chowk is expected to be completed before in two years from now.
The area will be most readily approachable and will be hardly 20 min drive from the IGI.
 The project has a few sparklers which make it unusually attractive for a Group Housing. It boasts of an 8 acre mini golf course, 8 acre central park along with other features like 7 star club gymnasium round the clock power and water supply etc.
 
 
 
Standard Specifications
 
External Façade of Towers
Textured Paint Finish
Flooring
Liviing/Dining
Porcelain Vitrified Tiles
 
Bed Rooms
Ceramic Tiles 
 
Servant's Room
Ceramic Tiles 
 
Balcony
Anti Skid Ceramic Tiles
 
Terrace on roof
Anti Skid Ceramic Tiles
 
Lift Lobby
Selected Granite/Marble
Kitchen
Flooring
Ceramic Tiles
 
Dado
Ceramic Titles above working platform, rest Oil Bound Distemper
 
Platform
Granite Counter with single bowl stainless steel sink with drain board 
Toilets
Dado
Selected Ceramic Titles
 
Floorings
Ceramic Tiles 
 
Fittings
Granite/Marble Counter, white sanitary fixtures, contemprory styled CP Fittings
Doors & Windows
Windows
Powder Coated Anodized Aluminium Glazing
 
Doors
Seasoned hardwood frames with painted board shutters.
Facilities
Electrical
Conduit Copper electrical wiring for all light and power points
 
 
 
*Architects and The Developer reserve the right to alter the specifications and facilities for design improvement.
 
 
Delux Specifications
Platform
Granite Counter With Double Bowl Stainless Steel Sink With Drain Board And Geysers
 
 
Toilets
 
Dado
Selected Ceramic Tiles
Floorings
Ceramic Tiles / Granite / Marble
Fittings
Granite / Marble Counter, White Sanitary Fixtures, Single Lever CP Fittings & Geysers
 
 
 
 
Windows                           
Powder Coated / Anodized Aluminum Glazing
 
 
Doors
Seasoned Hardwood Frames With European Style Moulded Shutters
 
 
Electrical
Conduit Copper Electrical Wiring For All Light & Power Points
 
 
Air Conditioning
Provision Of Copper Conduits and Drainage Pipes For Split Air Conditioning
 
Air-conditioners in all bed rooms
*Architects and The Developer reserve the right to alter the specifications and facilities for design improvement.
 
 
Price List and Payment Plans

Group Housing (Sector-37D)- Gurgaon
 
 
 
Super Areas (in sq.ft.)
Booking Amount
 
 
1475* (2BR+Study)
Rs. 3,00,000/-
1775* (3 BR + Study)
Rs. 4,00,000/-
2250* (3 BR +Study+ Servant)
Rs. 4,50,000/-
2450* (4BR+Study+ Servant )
Rs. 5,00,000/-
* Areas mentioned above are tentative & may vary +  15% in Super Area.

 
Price List For GH at Gurgaon

 
 
Basic Sale Price(BSP)
Rs. 1995/-+ Any of the following options
 
 
Option 1-Specification Charges ( Standard)
350/-
 
 
Option 2-Specification Charges (Deluxe)
500/-
 
 
 
 
Note: Specification Charges are compulsory however applicant has to opt for either of the two options mentioned above.
 
 
 
 
 
Other Charges
 
EDC(Extrenal Development Charges)
137/-
 
 
IDC(Infrastructure Development Charges)
34.45/- per sq ft
 
 
PLC(Prefrential Location Charges):-
 
Penthouses
150/- per sq. ft.
Corner
100/- per sq. ft.
Corner + Club Facing or Park Facing
150/- per sq. ft.
Park Facing
100/- per sq. ft.
Ground Floor
150/-per sq. ft
1st Floor
100/-per sq. ft
2nd - 3rd Floor
75/-per sq. ft
 
 
Reserved Covered Parking
250000/- per slot
 
 
IFMS(Interest Free maintenance Security)
50/- per sq ft
 
 
Club Membership Charges
100000/- per family
 
 
Fire Fighting & Power Back-up Installation Charges
50/- per sq ft
 
 
Note: All Prices mentioned are escalation free & Basic Sales Price includes (Base Price+ Specification Charges)
 
 
 
 
 
 Construction Linked Payment Plan
 
 
 
Booking Amount
Rs.3,00,000/-, Rs.4,00,000/-,Rs.4,50,000/-, Rs.5,00,000/-
 
 
On or Before 60 days
Complete 20% of BSP 
 
 
At the start of Excavation
10% of BSP + 50% of PLC + 50% of (EDC+IDC)
 
 
On Casting of Ground Floor Slab
10% of BSP+50% of PLC + 50% of (EDC+IDC)
 
 
On Casting of 3rd Floor Slab
10% of BSP + CPC
 
 
On Casting of 6th Floor Slab
10% of BSP+Club Membership Charges
 
 
On Casting of 9th Floor Slab
10% of BSP
 
 
On Casting of Top Floor Slab
10% of BSP
 
 
On start of Masonary Work*
7.5% of BSP
 
 
On start of Cladding
7.5% of BSP+FFC
 
 
At the time of offer for Possession
5% of BSP+ IFMS+ Registration charges+ Stamp Duty
 
 
*This installment & subsequent installments may not come in the same order in which they are mentioned. 
 
Depend on development/construction at site.
 
 
 
 
 
Down Payment Plan (10% rebate)
 
Booking Amount
Rs.3,00,000/-, Rs.4,00,000/-,Rs.4,50,000/-, Rs.5,00,000/-
 
 
Within 15 days from offer for Allotment
Complete 85% of BSP +100%Add. Charges
 
 
At the time of Possession
5% of BSP+ IFMS+ Registration charges+ Stamp Duty
 
 
Add. Charges includes PLC+EDC+IDC+CPC+Club Membership+FFC
 

 
 
NOTES: The developer reserves the right to alter/enhance the above mentioned additional expenses.  The amount mentioned here are indicative.